banner



What Verifies That Separate Systems Can Work Together Passing Data Back And Forth Correctly?

مظن سردم | رمع اللهدبع لا تامولعم لاةيراد ( MIS ) | abdallaoreda@hotmail.com 55060192 |

1 / eleven

Affiliate 09 Test Banking concern | Answered

i. The systems development life cycle (SDLC) is the overall process for developing information systems, from

planning and analysis through implementation and maintenance.

Truthful

2. The planning phase establishes a high-level plan of the intended project and determines project becomeals.

Truthful

iii. Business requirements are the specific business requests the system must meet to be successful, so the analysis

phase is critical considering business requirements drive the entire systems development effort.

Truthful

4. Process one thousandodeling involves graphically representing the processes that capture, manipulate, store, and distribute

information betwixt a due southystalk and its environment.

True

5. The implementation stage involves taking all of the detailed design documents from the design phase and

transforming them into the actual southwardystem.

Simulated

Feedback: The development phase involves taking all of the detailed design documents from the design phase and

transforming them into the bodily system.

6. The assay phase establishes descriptions of the desired features and operations of the system including screen

layouts, business organization rules, procedure diagrams, pseudo codeast, and other documentation.

FALSE

Feedback: The design phase establishes descriptions of the desired features and operations of the organisation including

screen layouts, omnibusiness rules, process diagrams, pseudo code, and other documentation.

vii. The pattern phase establishes descriptions of the desired features and operations of the system including screen

layouts, business rules, process diagrams, pseudo code, and other documentation.

TRUE

8. The testing stage takes all the detailed design documents from the design phase and transforms them into the

bodily system.

FALSE

Feedback: The development phase takes all the detailed pattern documents from the pattern phase and transforms

them into the actual system.

9. The development stage brings all the project pieces together into a special testing environment to eliminate errors

and bugs and verify that the system meets all the business requirements divers in the analysis phase.

FALSE

Feedback: The testing phaseastward brings all the projection pieces together into a special testing environment to eliminate

errors and bugs and verify that the system keets all the business requirements defined in the analysis stage.

x. Bugs are defects in the code of an information system.

TRUE

11. Blastoff testing occurs when programmers test the system to ensure it is bug-free.

Faux

Feedback: Development testing occurs when programkers test the system to ensure it is bug-free.

12. Development testing verifies that separate systems can work together passing data back and forth correctly.

Fake

Feedback: Integration testing verifies that divide southwardystems tin can work together passing data bacg and forth correctly.

13. Integration testing verifies that the units or pieces of code function correctly when integrated together.

Simulated

Feedback: System testing verifies that the units or pieces of code function correctly when integrated together.

14. User credence testing (UAT) determines if the system satisfies the user and business requirements.

True

What Verifies That Separate Systems Can Work Together Passing Data Back And Forth Correctly?,

Source: https://www.studocu.com/row/document/qatar-university/information-systems/chapter-09-test-bank-answered/17252489

Posted by: lindstred1965.blogspot.com

0 Response to "What Verifies That Separate Systems Can Work Together Passing Data Back And Forth Correctly?"

Post a Comment

Iklan Atas Artikel

Iklan Tengah Artikel 1

Iklan Tengah Artikel 2

Iklan Bawah Artikel